Ötztal Tourist Center 2021

Ötztal Tourist Center 2021

Client | Contracting entity: Ötztal Touristik
Planning | Implementation: AMT
Event Site: Ötztal – Tirol

Scope metron eging GmbH:

  • Wall and furniture construction

Special features:

  • Polygonal projection screen
  • Moveable stand

Audi 50 Jahre Vorsprung durch Technik

Audi 50 Jahre Vorsprung durch Technik

Client | Contracting Entity: AUDI AG
Concept and Architecture: Design Company Agentur GmbH
Event Site: Audi Forum Neckarsulm

Scope metron eging GmbH:

  • detailed construction
  • production
  • assembly and on-site commissioning

Steel construction at new building of the elementary school Munich

Steel construction at new building of the elementary school Munich

Public tender

Client | Contracting Entity: Landeshauptstadt München, Baureferat, Hochbau
Planning | Implementation: Auer Weber
Event Site: München Allach – Theodor Fischer Straße

Scope metron eging GmbH:

  • Planning period and tonnage:
  • August 2020 – Oktober 2022
  • Tonnage of steel used: 150t
  • Preparation of shop drawings for:
  • Canopies
  • Escape balconies
  • Escape staircases
  • Transformer house incl. lamella facade
  • Lamella enclosure for an escape staircase incl. roofing
  • Production, painting and assembly of:
  • approx. 800 running meters of steel escape balconies
  • approx. 520m² canopies
  • 3 external steel escape staircases
  • Transformer house incl. lamella facade
  • Lamella enclosure incl. roofing

BMW AG AMC Oberschleißheim

BMW AG AMC Oberschleißheim

Client: BMW AG
Planning | Implementation: New Order GbR / metron eging GmbH
Event Site: Mittenheimer Str. 64, 85764 Oberschleißheim

Scope metron eging GmbH:

  • organization
  • construction
  • production
  • assembly

BMW Welt Rolls Royce 2021

BMW Welt Rolls Royce 2021

Client: BMW AG
Planning | Implementation: Conex GmbH, Meiré&Meiré
Event Site: BMW Welt Munich, Germany

Scope metron eging GmbH:

  • Execution / workshop planning
  • Electrical and network planning incl. implementation
  • Ceiling & vehicle lighting
  • Installation of a new acoustic ceiling
  • Implementation of the complete wall construction
  • Implementation of the complete floor construction
  • Fabrication/Assembly/Transportation

Special features:

  • Over 100 ceiling spots recessed into the ceiling and individually controllable
  • Switchable foil to separate the Bespoke area (consulting area for customers)
  • Glass balustrades with curved panes without visible fastenings
  • 4.5m high cabinet element incl. lighting with continuous side walls

Copyright: BMW AG

Community Center Waldkirchen 2021

Community Center Waldkirchen 2021

Public tender

Client:  Bayern Tourismus Marketing GmbH
Architect | Planning:  Innenarchitekt BDIA Dipl. Ing. (FH) Thomas Honegg
Event Site: Bürgerhaus Waldkirchen

Scope metron eging GmbH:

  • Complete office remodeling with demolition / disassembly work
  • Drywall, flooring, painting, masonry and plastering works
  • Sanitary works
  • Electrical and network planning incl. implementation
  • Media technology
  • Route cladding
  • Mobile partition walls
  • Acoustic ceiling canvas
  • Pivoting media wall
  • Acoustic graphics

Humboldt Forum Berlin Children’s Museum 2020

Humboldt Forum Berlin Children’s Museum 2020

Public Tender

Client: Stiftung Humboldt Forum im Berliner Schloss
Architecture | Planning: kpm3 AG
Event Site: Stiftung Humbloldt Forum im Berliner Schloss

Scope metron eging GmbH:

  • Motion landscape
  • Auditorium with interior showcases
  • Table and seating platform system with showcases, tree house, presentation scaffolding and slide systems
  • Work and assembly planning
  • Static proof
  • Assembly

Star Finanz Office Remodeling 2020

Star Finanz Office Remodeling 2020

Client: Star Finanz
Concept & Architecture: Schmidhuber Brand Expierience
Event Site: Hamburg

Scope metron eging GmbH:

  • Acoustic ceiling
  • custom-built furniture
  • custom-built lighting
  • custom-built walls
  • kitchen remodeling

Gym expansion Marquartstein 2020

Gym expansion Marquartstein 2020

Public tender

Client | Contracting Entity: State building department Traunstein
Architecture | Concept: LS Architekten BDA
Event site: State country school home Marquartstein

Scope metron eging GmbH:

  • locksmithery
  • Exterior stairs incl. glass balustrade and handrails, interior all-glass balustrade, sheet metal cladding

Photographer: Josefine Unterhauser

MAN Forum Lounge

MAN | MAN Forum Lounge

Client | Contracting Entity: MAN Truck & Bus AG
Architecture | Concept: Schmidhuber Brand Experience GmbH
Event Site: MAN Truck & Bus AG Munich, Germany

Scope metron eging GmbH:

  • Detailed coordination with customer and architect
  • Workshop planning in 3D
  • Wall porch
  • Raised platform
  • 3D labels
  • Media technology
  • Lighting technology
  • Electrical engineering
  • Audio technology
  • Transport and assembly