AUDI IPD Q8PA 2023

AUDI IPD Q8PA 2023

Client | Contracting entity: AUDI AG
Planning | Implementation: Oettle Ferber Associates GmbH
Event site: Cape Town, South Africa

Scope metron eging GmbH:

  • Stand construction
  • Graphic work
  • Furnishing

Special features:

  • Complete pre-production with supervision from Germany

AUDI Management Meeting 2023

AUDI Management Meeting 2023

Client | Contracting entity: AUDI AG    
Planning | Implementation: Planwerkstatt GmbH
Event site: AUDI Ingolstadt

Scope metron eging GmbH:

  • detail and implementation planning
  • complete construction
  • stage kinetics
  • scaffolding
  • cladding

AUDI Las Vegas 2023

AUDI Las Vegas 2023

Client | Contracting entity:  AUDI AG
Planning | Implementation:  Oettle Ferber Associates GmbH
Event site: Waldorf Astoria, Las Vegas

Scope metron eging GmbH:

  • Setup incl. graphics
  • Assembly and transport

Hornbach Aufbaustelle

Hornbach Aufbaustelle

Client | Contracting entity: Hornbach Baumarkt AG
Planning | Implemention: &Konsorten GmbH
Event site:

  • Happiness Festival, Stubenhardt
  • Wacken Festival, Wacken
  • Highfield Festival, Großpösna
  • Ikarus Festival 2023, Memmingen
  • Hurricane Festival 2023, Eichenring
  • Summer Breeze 2023, Dinkesbühl

Scope metron eging GmbH:

  • Coordination with customer and agency
  • Coordination with TÜV and implemention of the requirements
  • Planning and construction of the entire module
  • Factory and execution planning
  • Welding and steel processing of the sea containers
  • Planning and execution of electrical engineering
  • Implementation of customer-specific exhibits
  • Inspection of the assembly locations
  • Planning and execution of assembly/disassembly

Lynk & Co

Lynk & Co

Client | Contracting Entity: Lynk & Co.     
Planning | Implementation: Avantgarde
Event Site: e.g. Stockholm, Marseille, Montpellier, Mailand, Turin, Valencia

Scope metron eging GmbH:

  • Coordination with customer and agency
  • Coordination with TÜV and implementation of the requirements
  • Planning and construction of the entire module
  • Factory and execution planning
  • Welding and steel processing of the sea containers
  • Interior and interior fittings
  • Installation of heating and air conditioning systems
  • Planning and execution of electrical engineering
  • Inspection of the assembly locations
  • Planning and execution of assembly/disassembly

BMW European Championships 2022

BMW European Championships 2022

Client: BMW AG
Architecture | Implementation:
Conex GmbH | Meiré&Meiré
Event Site: BMW Welt München

Scope metron eging GmbH:

  • Steel construction
  • catwalk on the roof
  • staircases
  • lighting
  • railings
  • timing furniture

Special Features:

  • Elevated catwalk incl. lighting on existing roof construction
  • Timing furniture incl. photo system for the participants
  • Slide & catwalk lighting incl. control and integration into the building operation system

Photographer: Sandra Sommerkamp, Performance Photography | Sandra Sommerkamp | Deutschland

Audi e-tron GT MW 2021

Audi | e-tron GT MW 2021

Client | Contracting Entity: AUDI AG
Planning | Implementation: Oettle Ferber Associates GmbH
Event Site: Zenith Kulturhalle München

Scope metron eging GmbH:

  • assembly, disassembly and transport
  • driving course with steel frame constructions
  • build up workshop areas
  • 40 m long wind tunnel

Pavilion German Ministry of Food Agriculture – Expo Beijing

Pavillon German Ministry of Food Agriculture – Expo Beijing

Client | Contracting Entity: gtp2 Architekten / Messe Hamburg
Architecture | Planning: A und O Architekten
Project management: Kontrapunkt
Event Site: Expo, Beijing, China

Scope metron eging GmbH:

  • Detailed planning
  • Implementation / Manufacturing
  • Installation and transport planning

Implemented exhibits:

  • Secret Garden – Place of longing

Audi eDomesticity Salone de Mobile

Audi eDomesticity | Salone de Mobile

Kunde | Contracting Entity: AUDI AG
Architecture | Concept: Bathke Geisel Architekten, München
Concept | Communiaction: Hani Rashid and Lise Anne Couture /
Asymptote Architecture, New York
Event Site: Piazza Sempione Mailand, Italien

Scope metron eging GmbH:

  • Main contractor
  • steel construction
  • floor and podium construction
  • floor graphics / tubes / balustrades
  • lighting technology
  • incl. transport, assembly and disassembly

Special Feature:

  • 25t. steel construction, rings with a diameter of 7,2m
  • more than 500 tubes with various diameters

Film Production: DOJO Filmhouse GmbH, Munich

Audi Car Display Spain

Audi | Car Display Spain

Client | Contracting Entity: Volkswagen Audi España, S.A.
Planning | Implementation: Planwerkstatt
Event Site: Sierra Nevada & Baqueira Beret, Spain

Scope metron eging GmbH:

  • Execution Planning
  • Construction
  • Logistics
  • Mounting and Dismounting