Audi e-tron GT MW 2021

Audi | e-tron GT MW 2021

Client | Contracting Entity: AUDI AG
Planning | Implementation: Oettle Ferber Associates GmbH
Event Site: Zenith Kulturhalle München

Scope metron eging GmbH:

  • assembly, disassembly and transport
  • driving course with steel frame constructions
  • build up workshop areas
  • 40 m long wind tunnel

Jubilarians 2020

Jubilarians 2020

In 2020, the honoring of our long-term employees could only be held in a small circle and in compliance with the regulations with the relevant distance.

The heads of the respective departments, the management and the jubilarians were invited.

20 years: The jubilarians from left to right: Aytunc Gökmen, Michael Marzik and Robert “Roger” Thoma

10 years: The jubilarians front row from left to right: Andreas Steininger, Sascha Meyer, Tobias Stutzig, Matthias Reicherseder and Johann “John” Sammer
Second row from right to left: Bernhard Schober, Dominic Graf, Siegfried Drasch, Stefan Krenn and Wolfgang Nader
(not on the photo: Friedrich Thoma and Josef Gotzl)

Pavilion German Ministry of Food Agriculture – Expo Beijing

Pavillon German Ministry of Food Agriculture – Expo Beijing

Client | Contracting Entity: gtp2 Architekten / Messe Hamburg
Architecture | Planning: A und O Architekten
Project management: Kontrapunkt
Event Site: Expo, Beijing, China

Scope metron eging GmbH:

  • Detailed planning
  • Implementation / Manufacturing
  • Installation and transport planning

Implemented exhibits:

  • Secret Garden – Place of longing