20 years part of metron eging 2017

There from the very beginning – part of the metron eging team for 20 years

This year was a first for honoring employees that have been part of the company for already 20 years.
Part of the company since 1997:
from left: Karin Leuoth, Norbert Schneider, CEO Christian Kainz, Robert Höglinger, Benjamin Sammer, Attila Leka

All of the staff got together to create a special video, jubilee journal and surprise after work party to congratulate the CEO Mr. Christian Kainz for his 20 year jubilee at the company.

BMW Welt

BMW | BMW Welt

Client: BMW AG
Architecture: bfm-net GmbH
Planning: becc agency GmbH
Event Site: BMW Welt

Exhibitions:

  • BMW 7 Series South Platform
  • BMW i (First Floor)
  • BMW i Smart Home (Second Floor)
  • BMW Individual
  • BMW M Exhibition
  • Special Exhibition Mission Impossible 5
  • Special Exhibition BMW M2

Scope metron eging GmbH:

  • Execution planning
  • Manufacturing, Delivery und Mounting
  • Interior construction

© BMW AG
© Photo: Marcus Buck

BMW Welt MINI

BMW | BMW Welt MINI

Client: BMW | MINI
Planning | Implementation: bfm | becc
Event Site: BMW World Munich, Germany

Scope metron eging GmbH:

  • Execution planning | Manufacturing planning
  • Manufacturing and Mounting on site

Enlargement of the MINI and MINI Shop Area:

  • Steelwork elements, floor and wall enlargement with
    different kinds of material
  • Furniture and exhibit construction
  • Integration of media technology and illumination elements

© BMW AG
© Photo: Marcus Buck

Hoffmann Group Showroom

Showroom Odelzhausen 2014

Client: Schmidhuber, Munich
Architecture | Concept: Schmidhuber+Partner, Schmidhuber+Kaindl
Event Site: Showroom Odelzhausen 2014, Germany

Scope metron eging GmbH:

  • Execution planning
  • Delivery and Mounting
  • Interior construction (stage construction incl. floor covering, dry construction, benches, glass wall, logos)
  • Exhibits (information pillar, multimedia tables, suspended mobile, sample material wall)

Photographer: Olaf Becker, Munich/Frankfurt

The Hoffmann Group, Europe’s largest branch for quality tools, celebrates its opening of a highly modern Operating Facilities Center in Bavarian Odelzhausen in May 2014. This is the headquarter from which all products, such as the private label GARANT, are dispatched and delivered to Germany, Europe and around the world. The company SCHMIDHUBER has designed and implemented a 500 sq m large ‘Experience Showroom’ within the building, in which clients, suppliers and dealers can learn about the extensive service offering and actually test the products inside a real life setting.

Audi IAA 2019

Audi | IAA 2019

Client | Contracting Entity: Audi AG
Planning | Implementation: Schmidhuber Brand Experience GmbH
Event Site: 68. IAA Pkw 2019, Germany

Scope metron eging GmbH:

  • Steelwork, stand construction, exhibits, architectural lighting, assembly, disassembly
  • Exhibition area: 3.100m²
  • Double-deck: 1.000m²

Special Feature:

  • 4 showcases each fitted with one car (exhibit)
  • exclusive lounge
  • SSF Lounge
  • authentic recreation of hands with a size of over 5m

Photographer: Andreas Keller Fotografie

Mercedes Benz Truck bauma 2019

Mercedes Benz Truck | bauma 2019

Client | Contracting Entity: Daimler AG
Architecture | Planning: Agentur für Marken(t)räume
Event Site: bauma 2019, Munich

Scope metron eging GmbH:

  • 2.500m² stand construction with 420m² external area
  • Assembly and Disassembly
  • Floor mainly oak parquet, as well as carpet and laminate
  • Wall construction predominantly in fabric (molton, blockout fabric and mesh fabric)
  • Sprinkler-compatible fabric covers with light bars of 9m length
  • 7m high facade
  • Incl. Electricity, lighting and network cabling

Special Feature:

  • Approx. 100lm 3D silhouette on the facade in 3-4 levels
  • Stand floor able to carry trucks with up to 18t weight
  • 4.5m high vehicle totems with 48″ touch screens
  • Planning and production in short time period

Photographer: Andreas Keller

Rolls Royce Shanghai 2019

Rolls Royce | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Puchner P3
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • mounting the MAS supporting structure
  • delivery of various conventional components
  • coordinating of the materials

Photograph: Fotodesign Kilian Bishop für BMW Group

BMW Shanghai 2019

BMW | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co. KG
Project Management: Conex GmbH
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • Assembly /dissasembly
  • conventional stand construction
  • logistics
  • steelworks
  • exhibits
  • Ground area 3,650 m²
  • Upper Area 400 m²

Special Feature:

  • major logistics challenge
  • coordination of the materials from the locations in Germany and China
  • efficient use of existing stock

Photograph: Fotodesign Kilian Bishop für BMW Group

MINI | Shanghai 2019

MINI | Shanghai 2019

Client | Contracting Entity: BMW AG
Planning | Implementation: Meiré und Meiré GmbH & Co. KG
Project Management: Conex GmbH
Event Site: China Expo Complex Shanghai

Scope metron eging GmbH:

  • Assembly / dissasembly
  • conventional stand construction
  • logistics
  • steelworks
  • Ground area: 986m², Upper Area 150m²

Special Feature:

  • major logistic challenge
  • coordination of the materials form the locations in Germany and China
  • suspended facade made of steel
  • aluminium and polycarbonate
  • elaborate decoration

Photograph: Fotodesign Kilian Bishop für BMW Group

Grohe ISH 2019

Grohe | ISH 2019

Client | Contracting Entity: Grohe AG
Architecture | Concept: D’art Design Gruppe / Grohe Design Team
Event Site: ISH 2019, Germany

Scope metron eging GmbH:

  • Detail Planning
  • Implementation | Production
  • Assembly and disassembly

Special features:

  • 1500m² floor space
  • Reconstruction of 400m² ancillary rooms for press and board
  • Construction of 700m² VOP area
  • Installation of over 100 different materials / surfaces
  • 93 water connections for sinks, showers and toilets
  • 16 chrome balls with diameters up to 1.9m
  • 500 lm LED

Pictures: Ken Schluchtmann / diephotodesigner.com